|
Project:
QS40 Webb Dock, Melbourne
To help develop a
full automated, rope-less mooring control system for a
dock in Melbourne, Mooring Systems Ltd called in
Christchurch-based Professional Electrics Ltd (Prolec).
As the roll-on,
roll-off vessel comes close to the dock, vacuum pads
suck the ship into the padded dock. Automatically
these pads ‘walk’ vertically or laterally, across the
ship to compensate for loading changes, tide and wind
shifts.
When the pads
maximum ‘walk’ is reached air is released so the pads
can move a very small distance, then a vacuum is
created again, air is released, pads walk, vacuum
created, and so on.
Mooring Systems
Ltd came up with the idea, and engaged Prolec to
develop the electrical and software components. As a
result manpower is reduced, safety is increased and
the whole process is automated |

QS40 Webb Dock, Melbourne
-Professional Electrics Ltd |